This page will be kept updated with key information about the hardfork.

  • Mainnet has been migrated on block 31056500, March 26, 2025, 3:00 AM UTC.
  • The Alfajores testnet has been migrated on block 26384000, September 26, 2024.
  • The Baklava testnet has been migrated on block 28308600, February 20, 2025.

Node operators should review this page along with Migrating a Celo L1 Node and Running a Celo Node.

The two main steps to prepare for the hardfork are

  1. Upgrading L1 nodes
  2. Running a pre-migration (Or choosing to use snap sync to start your L2 node, in which case no migrations are needed. See Running a Celo Node.)

Upgrade L1 nodes

Prior to the L2 hardfork, all node operators must upgrade their existing L1 (celo-blockchain) nodes to version v1.8.9. This release defines hardfork block numbers such that nodes will stop producing or accepting blocks immediately before the hardfork.

Run a pre-migration

Note that you may choose to start an L2 node from scratch using snap sync, in which case you don't need to run any data migrations. See Running a Celo Node for more information.

Node operators who plan to migrate their pre-hardfork data to an L2 node are strongly encouraged to run a pre-migration ~1-2 days before the hardfork. This will migrate the majority of data and minimize downtime during the full migration. To learn more about the migration process and tooling, see Migrating a Celo L1 Node.

warning

Migrating archive data is not recommended.

Both the pre-migration and full migration must be run on full node data. If you only have Celo archive nodes, we recommend syncing a full node in preparation for the L2 hardfork. You should not migrate archive data even if you plan to run an L2 archive node. See Running an archive node for more information.

We recommend running the migration script (which includes commands for both the pre-migration and full migration) using celo-l2-node-docker-compose. If necessary, the script can also be run from source.

Run pre-migration with docker

  1. Stop your node.

  2. Pull the latest version of celo-l2-node-docker-compose and cd into the root of the project.

    git clone https://github.com/celo-org/celo-l2-node-docker-compose.git
    cd celo-l2-node-docker-compose
  3. Run pre-migration command, where <network> is one of alfajores, baklava, or mainnet.

    warning

    Please ensure your node is stopped before running the migration tool.

    ./migrate pre <network> <path-to-your-L1-datadir> [<L2_destination_datadir>]

    If a destination datadir is specified, ensure the value of DATADIR_PATH inside .env is updated to match when you start your node.

Run pre-migration from source

If you'd like to run the pre-migration manually without Docker, you can do so by running the migration tool from source:

  1. Stop your node.

  2. Checkout and build migration script.

    git clone https://github.com/celo-org/optimism.git
    cd optimism/op-chain-ops
    make celo-migrate
  3. Run the pre-migration.

    go run ./cmd/celo-migrate pre \
    --old-db <path-to-your-L1-datadir>/celo/chaindata \
    --new-db <path-to-your-L2-destination-datadir>/geth/chaindata

Once the pre-migration is complete, you can start your L1 node again. The pre-migration may take several hours to complete.

Notes

  • You can repeat this process as many times as needed leading up to the full migration. We highly recommend pre-migrating at least once for mainnet, as migrating mainnet chaindata can take over 2 hours.

  • When you run the full migration, you must use the same destination datadir in order to benefit from the pre-migration.

  • The full migration will also run a pre-migration, so you will see logs from the pre-migration when running the full migration even if you already ran a pre-migration.

Key Information

Alfajores testnet

Baklava testnet

Mainnet

  • Block number: 31056500
  • Date: March 26, 2025 (3:00 AM UTC)
  • Minimum celo-blockchain version: v1.8.9
  • op-geth: celo-v2.0.0
  • op-node: celo-v2.0.0